Product Details:
|
Type: | Blast Furnace | Use: | Melting Furnace |
---|---|---|---|
Voltage: | 380V | Dimension(L*W*H): | As The Capacity |
Warranty: | 12 Months | Condition: | New |
After-sales Service Provided: | Engineers Available To Service Machinery Overseas | Power: | 45KW |
Weight: | 29tons | Application: | Car Battery Recycling Plant |
Product Name: | Lead Acid Melting Furnace | Melting Material: | Lead Paste |
Name: | Lead Acid Melting Furnace | Capacity: | 20-100ton Of The Lead Acid Melting Furnace |
Color: | Gray Of The Lead Acid Melting Furnace | Duty Cycle: | 24H Continuous Work |
Output Lead Shape: | Lead Ingot Of Lead Acid Melting Furnace | Feature: | Environmentally Friendly |
Function: | Car Battery Smelting Furnace | Port: | Qingdao Port Or Specified Port |
Nigeria cheap price melting furnace for the lead acid battery recycle
Product description :
The cupola furnace is an important equipment for melting cast iron in casting production. After casting the cast iron block into molten iron, it is poured into the sand mold to be cooled and then unpacked to obtain a casting.
The cupola is a vertical cylindrical melting furnace, which is divided into a front furnace and a rear furnace. The front furnace is divided into an iron outlet, a slag outlet, a furnace hearth and a bridge. The afterburner is divided into three parts, the top furnace, the waist furnace and the hearth.
The waist furnace is separated from the hot air pipe, and after the furnace is closed, it is sealed with mud. The top furnace is a heat exchanger. Mainly used in the production of cast iron parts, but also used in conjunction with converter steelmaking, because the top of the furnace is upward, it is called the cupola furnace.
Working Process :
Raw materials are melting in cupola furnace with water cooling system. Lava flows out from the side hole at lower part of cupola furnace, and then lava flows through fix launder, and flows into movable launder and falls on centrifuge. Lava will be fiberized under the centrifugal force produced by centrifuge rotating at high speed and high speed air flow from air ring. There is level controller installed at the top of cupola furnace, it can keep the cupola furnace material in level and control the temperature of waste gas in steady. The composition of waste gas contains: CO2, CO, SO2 and dust.
Car Battery Cutting And Smelting Plant:
The whole line of Car Battery Cutting And Smelting Plant is environmental protection. Firstly the scrap lead acid battery will be separated by the "Battery Separating machine". The final produts of separation section is plastic, lead, acid. The coarse lead can be refined by Smelting Section. And then you can choose the Cupola Furnace to get the refined lead ingot if you want to get deeply recycle. As for the Smelting Section, there is also Air Pollution Purify System to meet the environmental protection policy.
Parameter:
Model | Capacity (24 hours) |
RQ-2 | 20 ton |
RQ-4 | 40-50 ton |
RQ-6 | 60-70 ton |
RQ-8 | 80-90 ton |
RQ-10 | 100-120 ton |
Working Performance | |
Raw Material | Lead Plate Separated From Lead Acid Battery |
Final Product | Lead Ingot |
1. High water discharge rate, quick production.
2. Automatic feeding, automatic production.
3. Maintenance costs are low, almost without maintenance.
4. The wind blows at most once a day.
5. 12-hour production, 2 people is enough.
6. Can seal the furnace, do not produce during the day, only production at night.
7. Automatic circulation cut off water and power, do not burn the furnace.
8. Energy-saving and environmental protection, efficiency is high, round furnace - no dead Angle.
9. Self-flowing lead, lead water flows directly into the mold and is molded once and for all
FAQ:
1. CAPACITY?
---Our minimum capacity is 20 mt/d.we can customize the capacity as your demands.
2. How many reducing lead ingot can be produced by investing a ton of raw materials(car battery)?
---One ton Car Battery can produce about 600 kg Reducing lead ingot.
3. Output Lead Ingot Shape
---Ingot
4. now we using for Furnace oil, your one Burner system gas or Oil…?
---Its fuel is coke.
5. Coke usage
---160 kg coke can burn out 1 ton finished product
6. For the installation how many days we need?
---About 13 days
Contact
Any more questions you can inquiry me ! Welcome to our factory for visit!
Contact Person : Yorke Sun
Phone/Whatsapp/Wechat: +86 17737162834
Emai: yorke(at)recycle999.com
ADD: Zhengzhou, Henan, China (Mainland)
Contact Person: Mr. Zack
Tel: +8619903886476